Place of Origin: | China |
Brand Name: | Xinlingyu |
Certification: | IS09001:2015 , ISO 45001:2018 |
Minimum Order Quantity: | 1 set |
---|---|
Packaging Details: | Standard exporting packing |
Delivery Time: | 45 days |
Supply Ability: | 10 sets |
Name:: | Crane For Hot Dip Galvanzing | After-sales Service Provided::: | Overseas Third-party Support Available |
---|---|---|---|
Performance: | Reliable | Place Of Origin:: | Jiangsu, China (Mainland) |
Feature:: | Reasonable Structure | Brand Name:: | XINLINGYU |
ODM OEM high precision ISO9001 Hot Dip Galvanzing Crane
Packaging Details
Inner packaging--- plastic bag/bubble bag; outer packaging--- carton and wooden pallet/wooden case
Delivery Time
20-50 days
High quality service:
Item | Professional Service |
1 | Provide OEM/ODM service |
2 | Provide professional plastic mould design and manufacturing serivce |
3 | Provide plastic parts moulding/ printing/ painting service |
4 | Provide plastic parts assembly service |
5 | Provide plastic parts package service |
6 | Provide After-Sales service |
We will offer basic layout and electrical system diagram of production line within 30 days after signing the contact.
We will supply all information when delivery ,including line electrical drawing,original manual of equipment and instrument table,equipment conformity certificates,list of spare parts,equipement maintanance procedures,drawing and suppliers of quick-wear pats.
we are a powerful supplier who have joined the Trade Assurance to protect your payment to make sure that we deliver on time and manufacture quanlity products as required.
Note:
1. above sizes are standard sizes.
2. customized sizes are available.
3. price without ventilation system, draught fan and tube sizes depend on laboratory layout on site.
The designing of this production line takes ETP, energy saving, less labor and low cost as top priority. The line includes transportation system, auto acid washing system, acid smoke collection system, auto flux heating system, flux online reproduce treatment system, G.I tank auto heating control system, zinc smoke collection system and basic technical device system.
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 25-40 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=3000USD, 100% in advance. Payment>=3000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
Contact Person: Mr Wu
Tel: +8613665117920