Production Capacity | 300ton/month Or More |
---|---|
Heating System | Electric Heating |
Kettle Material | Ceramic |
Control Method | Auto Control Of Zinc Liquid |
Core Components | PLC, Engine, Bearing, Gearbox, Motor |
Core Components | PLC, Engine, Bearing, Gearbox, Motor, Pressure Vessel, Gear, Pump |
---|---|
Weight | 30T |
Machine Type | Galvanizing Machine |
Dimension(L*W*H) | 60*4*2m |
Substrate | Iron |
Reaction | Fast And Effective |
---|---|
Cost | Saving |
Environment | Protection |
Packaging Details | standard export packing |
Delivery Time | 90 days |
Speed | Fast |
---|---|
Performance | Reliable |
Place Of Origin | China |
Price | Negotiation |
Packaging Details | Standard exporting packing |
Pipe Material | Low Carbon Steel, Mild Steel, GI Coil, HRC, CRC |
---|---|
Type | Pipe Making Machine, Tube Mill, Pipe Machine, Tube Machine |
Application | Drain Pipe, Structure Pipes, Construction Piling Pipes |
Production Capacity | 15-150 M/min |
Thickness | 40-100 Micron |
Delivery Time | 90 Days |
---|---|
Place Of Origin | Jiangsu, China (Mainland) |
Package | Cartons&pallets Or According To Requirements |
Surface Treatment | Plain,black,zinc Plated ,hdg |
Grade | 10.9S, 8.8S |