logo

Customized ISO9001 7.0x1.2x2.2m Zinc Tank for 20,000 T/Year Hot Dip Galvanizing Line

October 21, 2026

Latest company news about Customized ISO9001 7.0x1.2x2.2m Zinc Tank for 20,000 T/Year Hot Dip Galvanizing Line

Customized ISO9001 7.0×1.2×2.2 m Zinc Tank for a 20,000 Ton/Year Hot Dip Galvanizing Line

This project delivers a complete customized hot dip galvanizing line centered on a 7.0 × 1.2 × 2.2 m zinc tank, engineered for a 20,000 ton per year production capacity. The line is installed in an 81 × 15.9 m workshop, arranged in a ring layout, and heated by a furnace oil burning system. Every component is built to ISO9001 quality standards and sized around the customer's actual workpiece mix.

Customer Requirements

ItemRequirement
Workshop size81 × 15.9 m
Galvanizing tank size7.0 × 1.2 × 2.2 m
Production capacity20,000 tons / year
Workpiece typeDifferent kinds of workpieces
Production line layoutRing layout
Galvanizing tank heatingFurnace oil burning
Environmental systemMeets environmental requirements

Key Technologies

Tank Dimensions of the Main Production Line

The equipment mainly consists of a degreasing tank, acid pickling tanks, flux tank, galvanizing tank, water cooling tank, passivation tank, the galvanizing tank heating and control system, a ring type crane, an acid fume collection and treatment system, an optional fixed zinc smoke collecting and treatment unit, a flux de-ironing device, a flux heating system using flue waste heat, and a water cooling system.

TankDimension (L×W×H)Qty
Degreasing tank7.0 × 1.3 × 2.2 m1
Acid pickling tank14.0 × 1.3 × 2.2 m3
Flux tank7.5 × 1.3 × 2.2 m1
Galvanizing tank7.0 × 1.2 × 2.2 m1
Water cooling tank7.0 × 1.3 × 2.5 m1
Passivation tank7.0 × 1.3 × 2.5 m1
Acid fume closed room61.0 × 3.8 × 6.5 m1

Electricity, Water and Gas Requirements

Design Principles

Every design decision on this line follows four principles: energy saving, environmental protection, technology leadership and reliable quality at a cost-effective price. The result is a galvanizing plant that runs efficiently for 20,000 tons per year, keeps emissions inside the legal envelope, and protects the zinc tank through stable, precisely controlled thermal conditions.

Send us your workshop size, tank dimensions and annual capacity, and our engineers will design a customized ISO9001 galvanizing line to match.

Get in touch with us
Contact Person : Miss. Alice
Tel : 86-18626078867
Fax : 86-510-68930088
Characters Remaining(20/3000)