ISO9001 Flux Heating System fluxing solution heating of hot dip galvanizing line
Packaging Details
For rod, 1kg/bag, 20 kg/box.
For roll, 5kg/roll, 10kg/roll.
For ring, 1kg/bag, 10kg/box,
Delivery Time
Shipped in 20 days after payment
If the flux has only normal temperature, Zncl2 and HN4CL attachment will be slowly, and the flux is not easy to be dry on the working piece, resulting in the zinc explosion when the working pieces get into the zinc tank.
Burning tail gas heat recycling system without extra heating source, by heat exchanger to keep the temperature 60~70 °, the density of Zncl2, NH4CL reduced considerably, and also increased the uniformity of Zncl2, NH4CL attachment on the working piece, and the zinc layer will be more uniformly and good galvanization result.
We have specialized in Plant setup and layout for hot dip galvanizing, and have 2 in house products.
We have served and specilalized in Plant setup and layout for hot dip galvanizing, Resolve Quality Issues, Reduce consumption of Zinc below 50 Kg. Per MT, Provide 3rd party inspection certificates in case of disputes,Provide contractors for galvanizing as well as skilled and unskilled labourers
Features of ventilators