Oem type high precision zinc smoke collection system with Reasonable Structure
1. Customize zinc smoke collection cover according to zinc pot size.
2. Closed zinc smoke collection system, collection efficiency over 90%.
3. Each side has a regulator, which adjusts the zinc smoke collection effect of each side suction port to be consistent.
4. Guide plate is set on the upper edge of the zinc pot mouth,The effect of collecting zinc smoke can be better.
5. The side suction devices on both sides of the zinc pot are connected together through a three-way connection at the end of the zinc pot.
6. Fans use negative pressure to extract zinc smoke.
7. The zinc smoke reaches the zinc smoke treatment system through the pipeline. Reach the discharge standard.
FAQ
Are you trading company or manufacturer ?
A: We are manufacturer.
Q: Do you have project running?
A: We have rich overseas sucess case.
- High quality products certified by: SEFA, SGS, Ashrae etc.
- Fast & efficient service: professional & well educated team respone in 24h for sales and after-sales service request, provide solutions in 72h.
- Overseas installation available (Minimum cost base on China-standard).
- Factory visit availble!
- QC before shipping availble!
1, factory directly
2, better after-sale services
3, ISO,CE
4, on-time delivery
Steel plates are used on both sides of the zinc pot, the suction duct is left to absorb the air draft, centralized recycling process, the zinc pot width is larger than 1.8 m, which should not be used in this way; (applicable to hanging plating)
we are a powerful supplier who have joined the Trade Assurance to protect your payment to make sure that we deliver on time and manufacture quanlity products as required.
We will offer basic layout and electrical system diagram of production line within 30 days after signing the contact.
We will supply all information when delivery ,including line electrical drawing,original manual of equipment and instrument table,equipment conformity certificates,list of spare parts,equipement maintanance procedures,drawing and suppliers of quick-wear pats.
We will send engineer and high level technician when installing the production line.
We will test the whole line for one month and train the operater.
We will send engineers to service machinery overseas if necessary.