Power | 10 KW |
---|---|
Stroke | 5 M³/h |
Filter Area | ≥30m² |
Delivery Time | 30 days |
Supply Ability | 30 sets/ month |
Production Capacity | 300ton/month Or More |
---|---|
Heating System | Electric Heating |
Kettle Material | Ceramic |
Control Method | Auto Control Of Zinc Liquid |
Delivery Time | 90days |
Kettle Size(m) | 2×2×1.2 |
---|---|
Kettle Material | Ceramic |
Zinc Amount Of Kettle | About 28T |
Production Capacity | 300ton/month |
Delivery Time | 90days |
Packaging Details | CONTAINER |
---|---|
Delivery Time | 30-60 DAYS |
Supply Ability | 500 PIECE PER YEAR |
Place of Origin | CHINA |
Brand Name | Xinlingyu |
Place Of Origin | Jiangsu, China (Mainland) |
---|---|
Package | Cartons&pallets Or According To Requirements |
Surface Treatment | Plain,black,zinc Plated ,hdg |
Grade | 10.9S, 8.8S |
Quality Control | 100% Inspection During Production |
Condition | New |
---|---|
Warranty | 12 Months |
Type | Hot Dip Galvanizing |
Power(w) | Customized |
Application | Angle Steel |
Material | Alloy Steel |
---|---|
Place Of Origin | Jiangsu, China (Mainland) |
Certificates | ISO CE SGS WSF CQC |
CERTIFICATE | ISO |
Quality Control | 100% Inspection During Production |
Place Of Origin | Jiangsu, China (Mainland) |
---|---|
Brand Name | Xinlingyu |
Material | Carbon Steel, Alloy Steel |
Appearance | Bright Neat Body, Without Any Burrs |
Quality Control | 100% Inspection During Production |
Packaging Details | CONTAINER |
---|---|
Delivery Time | 60 DAYS |
Supply Ability | 500 PIECE /YEAR |
Place of Origin | CHINA |
Brand Name | Xinlingyu |
Pollution | Without |
---|---|
Auto Control | Hi-Tech |
Size | Customized |
Packaging Details | standard exporting packing |
Delivery Time | 60 days |